Consists of all the Man Machine Interface equipment , including servers, operators work stations, printers on a local area network, as well as a push button console. Control Center is located in the control room of the existing Main Control Building of HEL.PE./AIC refinery. There is also a Leak Detection System based on a Advanced Application Software (real time modeling) running on a dedicated server which is also appropriately integrated with the SCADA system.